Перейти к содержимому

Новости

Russian Defence Ministry Claims Strike on Bi-Mobile Data Center in Kyiv

Russia’s Ministry of Defence said it struck the Bi-Mobile data center in Kyiv with high-precision weapons and drones, alongside the Radionics enterprise. The ministry alleged that the facility held intelligence data and network equipment used by Ukraine’s armed forces; the claim and the impact on the site have not been independently confirmed in the provided material.

IndexBox Forecast Sees Data Centers Supporting Waterproofing-Sheet Demand Through 2035

IndexBox forecasts expansion in the global bitumen-rubber waterproofing-sheet market during 2026–2035, supported by investment in semiconductor fabs, data centers and high-specification electronics manufacturing. Hyperscale and edge facilities are identified as a major source of demand for durable waterproofing in below-grade structures and roofs.

Trump Announces AI Force Amid U.S. Debate Over AI Data Center Restrictions

President Donald Trump has announced an “AI Force” intended to oppose efforts to impede or constrain the growth of the U.S. AI industry. The announcement explicitly links the federal policy stance to disputes over restrictions on construction of new AI data centers.

Site Preparation Advances for Data Center Project in Kitakyushu’s Hibikino District

Site preparation is under way for a large data center project in Kitakyushu Science and Research City’s Hibikino district, Fukuoka Prefecture. The proposed facility’s proximity to Hibikino Municipal Elementary School has intensified resident opposition focused on round-the-clock cooling noise, heat discharge and safety.

Japanese financiers target AI infrastructure as large data-center plans advance in Akita and Tomakomai

Nippon Life Insurance plans to raise infrastructure financing, including lending for AI data-center construction, to JPY2 trillion by fiscal 2035, while Mitsubishi UFJ Bank has decided to invest in an AI-infrastructure fund exceeding JPY4 trillion in size. In parallel, a 500 MW grid-connected data-center concept is advancing in Akita Prefecture and SoftBank is developing a 300 MW grid-connected facility in Tomakomai, Hokkaido.

Yokogawa Calls for More Granular Power Measurement in AI and HPC Data Centers

Yokogawa Test & Measurement says AI and HPC workloads are making data-center power demand more dynamic, reducing the usefulness of measurement approaches based on long averaging periods. The company argues that operators need more detailed, synchronized visibility into electrical parameters to manage fast-changing loads.

APL Plans 120 MW Two-Building Data Center Project in Kitakyushu Amid Community Opposition

Asia Pacific Land (APL) is preparing a two-building data center project in Kitakyushu Science and Research City with a stated total connected power capacity of 120 MW. Site-preparation earthworks are under way, but the project faces resident opposition over construction noise, waste heat, fire and accident risks, and its proximity to Hibikino municipal elementary school.

Akita Discussion Links Data-Center Tax Receipts to Urban Development

Executives from the Development Bank of Japan visited Akita Prefecture on 18 September following their appointments and met with Akita Sakigake Shimpo. The related publication’s headline linked tax revenues from data centers to urban development, but the available text contains no project-level details or decisions.

Ohio Data-Center Incentives Face Local Moratorium and Statewide Political Scrutiny

Defiance, Ohio, has imposed a six-month moratorium on approvals for new data-center projects as residents pursue a November 3 vote to restrict all but the smallest facilities. Separately, Ohio Governor Mike DeWine has paused new applications for data-center tax exemptions pending legislative changes.

ITEQ says M9 laminate passed U.S. GPU manufacturer validation in H2 2025

Taiwanese copper-clad laminate supplier ITEQ said its M9 low-CTE, ultra-low-loss material passed validation by a U.S. GPU manufacturer in the second half of 2025. The company is positioning the qualification within its push toward advanced materials for AI servers and other high-end electronics markets.