Перейти к содержимому
Новости

$2.28bn Data-Center and Digital-Currency Infrastructure Investment Announced in Karakalpakstan

Редакция ЦОД:Главное

Источник изображения: первоисточник

Chinese partners have been announced as investors in $2.28 billion of data-center and digital-currency production infrastructure in the Kungrad and Takhiatash districts of Karakalpakstan, Uzbekistan. Separately, the first phase of Linkwise’s modular intelligent computing center in Takhiatash is reported to have entered operation.

Главное
  • $2.28 billion in Chinese investment has been announced for data centers and digital-currency production infrastructure in Kungrad and Takhiatash.
  • A separate data center is planned in Takhtakupyr.
  • Linkwise’s reported $150 million first phase in Takhiatash is described as launched; this figure applies to the phase, not the full facility.
  • The region’s power build-out includes a 1.5 GW wind project under construction in Kungrad, but no direct linkage to the data-center projects has been stated.
  • No IT capacity, project schedule or detailed split of the announced digital-infrastructure investment has been disclosed.

Karakalpakstan authorities have outlined a digital-infrastructure investment package under which Chinese partners are to invest $2.28 billion in data centers and infrastructure for digital-currency production in Kungrad and Takhiatash. The allocation of that total between data centers and digital-currency infrastructure has not been disclosed.

A separate data center is planned in Takhtakupyr. In Takhiatash, the first phase of Linkwise’s modular intelligent computing center has reportedly been launched, with phase CAPEX of $150 million. The available information does not disclose the facility’s IT capacity, the number of sites involved, delivery schedule, named investors behind the broader $2.28 billion commitment, or the future phases of the Linkwise project.

The proposals are emerging alongside substantial power-sector activity in the region. Construction has started on ACWA Power’s 1.5 GW wind project in Kungrad, with reported project cost of $2.6 billion. Associated energy infrastructure includes 1,500 km of high-voltage lines, three new substations and upgrades to two existing substations. Two wind plants with combined capacity of 300 MW and a 100 MW energy-storage system have also reportedly been launched in Karauzak.

These parallel developments could provide the basis for a larger power-intensive digital cluster, combining data-center capacity with digital-currency infrastructure. However, the source does not establish a contractual or direct supply link between the wind generation, transmission and storage projects and the announced data-center developments. The storage project is specified only in MW, with no energy capacity or duration disclosed.

Почему это важно

If executed, the projects could position Karakalpakstan as a significant location for power-intensive digital loads in Uzbekistan. The critical issue for the data-center market will be whether the proposed facilities are practically matched with available grid capacity, generation and operating conditions for digital-currency infrastructure; no IT load has been disclosed.

Источники